One licensed crew for the whole house

Home Remodeling in Maryland

Bathrooms, kitchens, basements and the repairs that go with them, handled by our own licensed crew across Baltimore, Howard, Carroll, Harford, Anne Arundel and Montgomery counties.

  • Licensed & insured, MHIC #117279
  • Free in-home estimates
  • 1-year labor warranty
  • Military, senior & teacher discounts

4.9 on Google · 93 reviews · Based in Reisterstown, MD

Request Your Free Estimate

What we build

Home Remodeling Under One Roof

Handyman on Demand is a licensed Maryland remodeling contractor based in Reisterstown. Our own crew remodels bathrooms, kitchens and basements and handles the flooring, carpentry, painting and exterior work that goes with them.

Honest pricing

What Remodeling Costs in Maryland

Typical ranges for the projects we do most. Every estimate is free, written and itemized before any work starts.

Bathroom refresh

$2,500–$5,000+

Vanity, faucet, toilet, lighting and new flooring in a small bath.

3–5 days

Get My Free Estimate

Most common

Hall or guest bath

$6,000–$12,000+

New tub or shower, tile, vanity, flooring and lighting.

7–10 days

Get My Free Estimate

Kitchen remodel

$15,000–$65,000

From a cosmetic refresh to new cabinets, counters and layout tweaks.

1–6 weeks

Get My Free Estimate

Basement finish

$30–$60 / sq ft

Framing, insulation, drywall, flooring and lighting throughout.

4–8 weeks

Get My Free Estimate

What moves the price: room size, layout changes, plumbing or electrical moves, finish level and what we find behind the walls.

How we work

From First Call to Final Walkthrough

One project manager, one crew and a schedule you can plan around.

Under-stair storage closet framed, drywalled and lit, a Handyman on Demand project
  1. 1

    Tell us about the project

    Call (410) 949-0063 or use the form. Photos and rough measurements help us prepare.

  2. 2

    Free in-home estimate

    We look at the space, talk through options and budget, and check for anything hidden like old plumbing or soft subfloor.

  3. 3

    Written, itemized quote

    A clear price, a realistic schedule and what is included. No pressure and no surprise add-ons.

  4. 4

    Permits and materials

    We pull the county permit when the work needs one and order materials before demo starts, so the job does not stall.

  5. 5

    Clean, organized build

    Floors and furniture protected, dust controlled and the work area cleaned at the end of each day.

  6. 6

    Final walkthrough

    We check every detail with you before we call it done. Our work carries a 1-year labor warranty.

Homeowner tips

Remodeling Tips for Maryland Homes

  1. 01

    Plan the order of projects

    If a kitchen and a bathroom are both on the list, tackle the one that shares plumbing walls first so you open each wall only once.

  2. 02

    Budget 10–15% for surprises

    Older Maryland homes often hide rotted subfloor, ungrounded wiring or galvanized pipe. A contingency keeps the project moving.

  3. 03

    Know which work needs a permit

    Moving plumbing, adding circuits, removing walls and finishing a basement usually need a county permit. Cosmetic updates usually do not.

  4. 04

    Mind basement moisture

    Fix grading, gutters and any water entry before finishing a basement. Finishes fail fast on a wet slab.

  5. 05

    Choose durable floors for wet areas

    Porcelain tile and quality LVP handle bathrooms, kitchens and basements far better than solid hardwood.

  6. 06

    Hire a licensed MHIC contractor

    Maryland requires a Home Improvement Commission license for most remodeling. Ask for the number and check it before you sign.

4.9 on Google · 93 reviews

What Maryland Homeowners Are Saying

“Handyman on Demand sistered joists; renovated a half bathroom; repaired drywall; mounted a TV; hung wallpaper; painted several rooms; and installed new lights and light switches. Their team showed up on time, did high quality work, and cleaned up each day before leaving.”

Aften Beeler Google review · bathroom, drywall & painting

“This company is top-notch. The project was completed with exceptional attention to detail, and the quality of work met expectations. Their pricing was fair and transparent, and communication throughout the entire process was clear, timely, and professional.”

Andrew Kelly Google review · home project

“Very satisfied with the customer service I received from Sara and her team. Covered my wood floors, cleaned up, took the trash with him, and showed me how to use my new faucet.”

Mary Ann Ferguson Google review · fixture installation

“Fast, reasonably priced, and high quality work. Very easy to work with. Highly recommend, I’ll be using them again if they are available.”

Todd Baker Google review · home repairs

Read all reviews on Google

Questions

Home Remodeling FAQs

What home remodeling services do you offer?

Bathroom, kitchen and basement remodeling, plus flooring, painting, carpentry, decks, siding repair and general handyman work. One licensed crew handles the whole project, so you are not coordinating separate trades.

How much does home remodeling cost in Maryland?

It depends on the room and the scope. A small bathroom refresh starts around $2,500 and most hall baths run $6,000–$12,000. Kitchens range from $15,000–$30,000 for a cosmetic refresh to $35,000–$65,000 for a mid-range remodel. Full basement finishes typically run $30–$60 per square foot. Your estimate is always written and itemized.

Are you licensed and insured?

Yes. Handyman on Demand holds Maryland Home Improvement Commission license MHIC #117279 and carries insurance. Our work comes with a 1-year labor warranty.

Do you pull permits?

Yes. When a project needs a county permit, such as moving plumbing, adding circuits, removing a wall or finishing a basement, we file it and schedule the inspections.

Do you offer financing or discounts?

Financing is available to qualified homeowners, and we offer military, senior and teacher discounts. Ask about current offers when you request your estimate. See how financing works.

What areas do you serve?

We are based in Reisterstown and work across Baltimore, Howard, Carroll, Anne Arundel, Harford, Montgomery, Frederick and Cecil counties. Find your town in the lists below.

How long does a remodel take?

A bathroom refresh takes about 3–5 days and a typical hall bath 7–10 days. A kitchen refresh runs 1–2 weeks and a mid-range kitchen remodel 3–6 weeks. A full basement finish usually takes 4–8 weeks.

Service areas

Find Your Town’s Remodeling Page

Choose a service, then your town for local costs, permit notes and answers for homes in your community.

Bathroom Remodeling in 124 Maryland communities. Pick your town for local pricing and FAQs, or see bathroom remodeling →

Kitchen Remodeling in 33 Maryland communities. Pick your town for local pricing and FAQs, or see kitchen remodeling →

Basement Remodeling in 20 Maryland communities. Pick your town for local pricing and FAQs, or see basement remodeling →

Howard County 2 areas

Anne Arundel County 2 areas

Harford County 1 areas

Frederick County 1 areas